  1. Leave the zip ties loose. Leave the zip ties loose. Leave the zip ties loose.
    • Leave the zip ties loose.

  2. Be gentle. Do no force the rod and keep it straight or you may damage the ball bearing by knocking some balls out. Be gentle. Do no force the rod and keep it straight or you may damage the ball bearing by knocking some balls out. Be gentle. Do no force the rod and keep it straight or you may damage the ball bearing by knocking some balls out.
    • Be gentle. Do no force the rod and keep it straight or you may damage the ball bearing by knocking some balls out.

  3. BE GENTLE. Do no force the rod and keep it straight or you may damage the inside of the bearing. BE GENTLE. Do no force the rod and keep it straight or you may damage the inside of the bearing. BE GENTLE. Do no force the rod and keep it straight or you may damage the inside of the bearing.
    • BE GENTLE. Do no force the rod and keep it straight or you may damage the inside of the bearing.

    • We highly recommend you scroll ahead and look at the whole procedure of zip tying the x assembly.

    • The procedure is quite simple, but it's hard to understand if you look image-by-image.

    • We'll first tighten both front zip ties, and only then both zip ties in the back.

  4. Note that on the left the rod is outside, while on the right the rod is inside. Note that on the left the rod is outside, while on the right the rod is inside.
    • Note that on the left the rod is outside, while on the right the rod is inside.

  5. Push the rods in place and tighten the back zip ties. Push the rods in place and tighten the back zip ties. Push the rods in place and tighten the back zip ties.
    • Push the rods in place and tighten the back zip ties.

  6. The X assembly is inserted.
    • The X assembly is inserted.

  7. Turn the JellyBOX from its back into normal position. Turn the JellyBOX from its back into normal position.
    • Turn the JellyBOX from its back into normal position.

  8. Leave the zip tie loose. Leave the zip tie loose. Leave the zip tie loose.
    • Leave the zip tie loose.

    • ▶ Video: Adjust the X Wire Harness Folding (50s)

    • Adjust the mounting point as needed so that the harness is folding nicely and predictably.

  9. In short, connect all the wires according to their labels. We'll start on the left.
    • In short, connect all the wires according to their labels. We'll start on the left.

  10. Make sure to match plus with plus... Make sure to match plus with plus... Make sure to match plus with plus...
    • Make sure to match plus with plus...

  11. ... and minus with minus.
    • ... and minus with minus.

  12. Make sure to match plus with plus and minus with minus. Make sure to match plus with plus and minus with minus. Make sure to match plus with plus and minus with minus.
    • Make sure to match plus with plus and minus with minus.

  13. This 12V line powers up the Z Probe and the Hotend fan.
    • This 12V line powers up the Z Probe and the Hotend fan.

Conclusion

You have installed the X assembly. This is arguably the longest and most complicated part of the whole build, so, kudos!

Filip Goc

Member since: 01/14/2016

18,037 Reputation

490 Guides authored

Team

team curriculum Member of team curriculum

2 Members

490 Guides authored

One Comment

The pictures in steps 44, 45, & 46 (as well as those in ch. 09 part 01 steps 11 & 12) show the T0 cable with the pink/red wire on the left & the black wire on the right. Are these images correct ? (And does it matter for this cable? I notice the wires of the T1 cable are not color coded.)

The cables I received for 10 Easy Kit Heated JellyBOX v2.1.b.b.2 are all stickered so that, if the label sticker faces up, the T0 black wire is on the left and the pink/red is on the right.

Thanks.