Skip to main content

Video Overview

Video Walkthrough

  1. Top of Y-Assembly (with "Jelly" etching)
    • Top of Y-Assembly (with "Jelly" etching)

    • Bed clips (3x)

    • M3x8 flathead screws (5)

    • Nylon lock nuts (5x)

  2. In the front, attach the one clip that is bent. Use only one screw and leave it a bit loose so that the clip can swivel open and close.
    • In the front, attach the one clip that is bent. Use only one screw and leave it a bit loose so that the clip can swivel open and close.

    • In the back, attach the two remaining two clips. Do not use washers - the clips themselves distribute the pressure in this case.

  3. Bottom acrylic piece (with outline etching of a jar) Top acrylic piece (with "Jelly" etching)
    • Bottom acrylic piece (with outline etching of a jar)

    • Top acrylic piece (with "Jelly" etching)

    • M3x14 flathead screws (4x)

    • Regular M3 washers (4x)

    • M3 nylock lock nuts (4x)

  4. Sandwich the top and bottom acrylic piece so that the "Jelly" label lays on top of the outline of a jar. If all goes well, you'll end up with a jar of jelly. Yum. Sandwich the top and bottom acrylic piece so that the "Jelly" label lays on top of the outline of a jar. If all goes well, you'll end up with a jar of jelly. Yum.
    • Sandwich the top and bottom acrylic piece so that the "Jelly" label lays on top of the outline of a jar. If all goes well, you'll end up with a jar of jelly. Yum.

  5. Y-Assembly
    • Y-Assembly

    • Linear bearings (4x)

    • Small, 4" zip ties (8x)

    • Large, 6" zip ties (2x)

  6. Thread all 4'' zip ties into the holes around the edges of all slots. The heads of the zip ties should be on the bearings. Drop in the bearings and tighten the zip ties with vise grip - normal tightening is sufficient here.
    • Thread all 4'' zip ties into the holes around the edges of all slots. The heads of the zip ties should be on the bearings.

    • Drop in the bearings and tighten the zip ties with vise grip - normal tightening is sufficient here.

    • Clip the ends of the zip ties.

  7. Make two loops out of 6'' zip ties above and below the jelly jar. These loops will help correctly position the build plate. The heads of the zip ties need to be on the bottom. Make two loops out of 6'' zip ties above and below the jelly jar. These loops will help correctly position the build plate. The heads of the zip ties need to be on the bottom.
    • Make two loops out of 6'' zip ties above and below the jelly jar. These loops will help correctly position the build plate. The heads of the zip ties need to be on the bottom.

  8. Most likely you received the front clip pre-bent. Just in case you didn't: Bend a part of the front clip down along the diagonal line (shown in the drawing) with your vise grip. This will allow your fingers to better grip and rotate the clip. Also, bend the right little tab on the clip to a straight 90 degree angle so that the clip can swivel fully. Also, bend the right little tab on the clip to a straight 90 degree angle so that the clip can swivel fully.
    • Most likely you received the front clip pre-bent. Just in case you didn't: Bend a part of the front clip down along the diagonal line (shown in the drawing) with your vise grip. This will allow your fingers to better grip and rotate the clip.

    • Also, bend the right little tab on the clip to a straight 90 degree angle so that the clip can swivel fully.

  9. Insert wisdom here. Insert wisdom here.
    • Insert wisdom here.

Finish Line

Filip Goc

Member since: 01/14/2016

18,037 Reputation

490 Guides authored

Team

team curriculum Member of team curriculum

2 Members

490 Guides authored

0 Comments

Add Comment